Customization: | Available |
---|---|
After-sales Service: | Included |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Main Parameters are as Following:
Max lifting capacity: 6ton
Jib length: 50m
Tip load: 1.3ton@50 m.
The Mast Size : 1.833*1.833*2.5m
This Tower Crane's order is from our new client. He is our good friend too. His company is a building construction company. He has many projects that need our tower cranes. For this model 5013 tower crane, it will used for building an apartment. Before placing this order,our clients visited our factory and our head office. On 3th,December,2018, our client and his friends visited our factory.
During 3th-5th December, 2018, they visited our office and met our boss. We signed the sales contract for 2 sets of 5013 Tower Cranes. On January,2019, we got the advanced payment and start to produce in time. During the production time, we still keep update the production photos to the clients. Our clients said our service is very thoughtful. Good cooperation is start!
After 30 days production, the tower cranes were smoothly shipped on February,2019. The 2 sets of tower cranes arrived in Cambodia 10 days later. When the clients checked the tower cranes, they said : Your tower cranes is very good,the quality really high,Thank you very much.
series | QTZ63 | |
Standard Model | 5013 | |
Max. Lift Load | 6t | |
Tip Load | 1.3t | |
Free Standing Height | 40m | |
Max. Anchorage Height | 130m | |
Jib Length | 50m | |
Mast size | 1.6×1.6×2.5m | |
Lifting Speed | (a=2)68/34 m/min (a=4)34/17 m/min |
|
Lift motor | 24/24/5.5kw | |
Wire rope diameter | 12.5mm | |
Trolley speed | 24/48 m/min | |
Trolley Motor | 2.2/3.3kw | |
Slewing speed | 0.65r/min | |
Slew Motor | 3.7kw*2units | |
Jack climbing speed | 0.58m/min | |
Jack climbing motor | 7.5kw | |
Power | 380V/50Hz/3P | |
Luxury Operate Cabin, Schneider Electric Parts |
Model | Standard Model | Jib Length/m | Tip load /t | Max Load/t |
QTZ31.5 | 4208 | 42 | 0.8 | 3 |
QTZ40 | 4808 | 48 | 0.8 | 4 |
QTZ50 | 5008 | 50 | 0.8 | 4 |
5010 | 50 | 1.0 | 4 | |
QTZ63 | 5010 | 50 | 1.0 | 5 |
5013 | 50 | 1.0 | 6 | |
5610 | 56 | 1.0 | 6 | |
QTZ80 | 5610 topless | 56 | 1.0 | 6 |
5513 | 55 | 1.3 | 6 | |
6010 | 60 | 1.0 | 6 | |
6010 | 60 | 1.0 | 8 | |
QTZ125 | 6015 | 60 | 1.5 | 8 or 10 |
QTZ160 | 6516 | 65 | 1.6 | 10 |
QTZ250 | 7030 | 70 | 3 | 12 or 16 |
QTZ315 | 7040 | 70 | 4 | 16 or 18 |
QTZ400 | 7055 | 70 | 5.5 | 25 |
QTD3020 | \ | 30 | 2 | 2.9 |
QTD4015 | \ | 40 | 1.5 | 6 |
QTK20 | \ | 25 | 0.8 | 2 |
1 | Torque limiter | it will warns when lifting weights reach to 90% of rated lifting torque. When reach to 110% of the rated lifting torque, it will limit rising upwards and trolley. |
2 | Weight limiter | Control the maximum lifting capacity, lifting weight reach to 40% of the rated capacity, limit high-speed lifting; lifting weight reach to 110% of the rated capacity, limit the lifting up |
3 | Height limiter | Control the lowest and highest extreme position of lifting hook |
4 | Slewing limiter | Control the extreme turns number of turn left and right |
5 | Amplitude limiter | Control trolley limit position of inward and outward |
6 | Overload protection | If the material is over the capacity, the crane will give a sharp warning for protection itself |
7 | Emergency brake | If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure |
8 | Control Method | Room control or remote control to avoid any injury to the operation staff |
9 | Main lifting motor | with thermal protection and currency protection |