Customization: | Available |
---|---|
After-sales Service: | Supply After-Sales Service |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
series | QTZ63 | |
Standard Model | 5013 | |
Max. Lift Load | 6t | |
Tip Load | 1.3t | |
Free Standing Height | 40m | |
Max. Anchorage Height | 130m | |
Jib Length | 50m | |
Mast size | 1.6×1.6×2.5m | |
Lifting Speed | (a=2)68/34 m/min (a=4)34/17 m/min |
|
Lift motor | 24/24/5.5kw | |
Wire rope diameter | 12.5mm | |
Trolley speed | 24/48 m/min | |
Trolley Motor | 2.2/3.3kw | |
Slewing speed | 0.65r/min | |
Slew Motor | 3.7kw*2units | |
Jack climbing speed | 0.58m/min | |
Jack climbing motor | 7.5kw | |
Power | 380V/50Hz/3P | |
Luxury Operate Cabin, Famous Electric Parts |
Model | Standard Model | Jib Length/m | Tip load /t | Max Load/t |
QTZ31.5 | 4208 | 42 | 0.8 | 3 |
QTZ40 | 4808 | 48 | 0.8 | 4 |
QTZ50 | 5008 | 50 | 0.8 | 4 |
5010 | 50 | 1.0 | 4 | |
QTZ63 | 5010 | 50 | 1.0 | 5 |
5013 | 50 | 1.0 | 6 | |
5610 | 56 | 1.0 | 6 | |
QTZ80 | 5610 topless | 56 | 1.0 | 6 |
5513 | 55 | 1.3 | 6 | |
6010 | 60 | 1.0 | 6 | |
6010 | 60 | 1.0 | 8 | |
QTZ125 | 6015 | 60 | 1.5 | 8 or 10 |
QTZ160 | 6516 | 65 | 1.6 | 10 |
QTZ250 | 7030 | 70 | 3 | 12 or 16 |
QTZ315 | 7040 | 70 | 4 | 16 or 18 |
QTZ400 | 7055 | 70 | 5.5 | 25 |
QTD3020 | \ | 30 | 2 | 2.9 |
QTD4015 | \ | 40 | 1.5 | 6 |
QTK20 | \ | 25 | 0.8 | 2 |
1 | Torque limiter | it will warns when lifting weights reach to 90% of rated lifting torque. When reach to 110% of the rated lifting torque, it will limit rising upwards and trolley. |
2 | Weight limiter | Control the maximum lifting capacity, lifting weight reach to 40% of the rated capacity, limit high-speed lifting; lifting weight reach to 110% of the rated capacity, limit the lifting up |
3 | Height limiter | Control the lowest and highest extreme position of lifting hook |
4 | Slewing limiter | Control the extreme turns number of turn left and right |
5 | Amplitude limiter | Control trolley limit position of inward and outward |
6 | Overload protection | If the material is over the capacity, the crane will give a sharp warning for protection itself |
7 | Emergency brake | If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure |
8 | Control Method | Room control or remote control to avoid any injury to the operation staff |
9 | Main lifting motor | with thermal protection and currency protection |